11/20/2017
6:34 PM
 
Permit No. BLD2017-0850 Permit Type   SINGLE FAMILY Site Address   1025 SUNNYVALE DR
ROCKWALL, TX 75087
Applied   03/24/2017 Applicant   D R HORTON HOMES
Approved   03/24/2017 Owner   D R HORTON HOMES
Issued   04/05/2017 Contractor   D R HORTON HOMES
Parent Permit No.   Description   NEW SINGLE FAMILY
  Notes   CONSTRUCTION CODES – 2015 International Residential Code & 2014 NEC Code and local amendments. 80% masonry construction, excluding windows and doors, unless the wall is a porch, patio, courtyard, or breezeway, in which event, the wall may be of non-masonry construction. Hardy plank or similar materials may be used for up to 50% of the masonry requirements. 2015 IRC narrow wall bracing requirements must be meet. Must use traffic rated cans in traffic areas. 3-3” Trees Required For inspection www.rockwall.com/buildinginspections/inpectionreq.asp.
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 05/25/2017P2-PLUMB ROUGHJames HopphanAPPROVED

 06/09/2017P3-FOUNDATIONJames HopphanDISAPPROVEPlastic wrap fell off some areas due to the weather. Repair and recall

 06/12/2017P3-FOUNDATIONJames HopphanAPPROVED

 09/28/2017P5-TEMP UTILITIESJames HopphanAPPROVEDOk to release gas serv.(9/28/2017 4:46 PM DG1) Atmos 9006865066

 05/04/2017P1-T-POLEMichael TiehenAPPROVED(5/4/2017 2:40 PM MT) Oncor conf #0630231

 05/23/2017P2-PLUMB ROUGHCustomer Survey(5/23/2017 10:18 AM MT) P26 - No inspection performed: rainy conditions / piping is wet / trenches are muddy

 06/07/2017P3-FOUNDATIONJames HopphanDISAPPROVE(6/7/2017 1:47 PM JH) FD04 - All plumbing in foundation that will be in contact with concrete must be encased in "thick pipe Insulation. Mill wrap or poly wrap/sleeve all piping from pad level through finished floor surface. (pipe insulation cant penetrate the finished floor)- P2603.5

 07/20/2017P4-FRAMINGMichael TiehenDISAPPROVE1) Provide proper fall on frostproof hose bibs. 2) Missing joist hanger in garage. 3) Install nail gaurd for plumbing at bottom plate in hall to master bed room. 4) Complete elec. to fireplace. 5) Complete hvac condensate overflow drain. 6) Install nail gaurd for plumbing through notched studs in right center bedroom. Ok to insulate.

 07/24/2017P4-FRAMINGMichael TiehenAPPROVED

 08/24/2017FLAT WORKMichael TiehenDISAPPROVEManhole cover must be raised flush with top of forms and all existing concrete removed. Ok to pour all but section of walk with manhole.

 09/13/2017FLAT WORKMichael TiehenAPPROVED